How long did all this take?  Atlantis has been more or less steadily ongoing since the beginning of 1996.  This section of the web gives you some idea of the progress along the way.  Although I didn't keep good records of what was happening in the early days (This was before the web was popular, remember), store receipts - notably Home Depot - give a pretty clear picture.

1996 Early work: Concrete floor plumbing work, two sewage pump basins.
1997 Structural work; Steel beam reinforcement, lally column removal and repositioning.

Rerouting heating ducts

Subfloor leveling and raising, and installing.
1998 Drywall finishing.

Bathroom shower floor mud job.

Hardwood (Birdseye maple) floor laying

1999 Staircase

Assorted curves and trim work

Hardwood floor finishing

Glass block wet bar

2000 Pool table

Ceilings

Underwater paintjob

Neon bar shark

Home theater

2001 Boiler

Bathroom Drywall

Surprisingly little else

2002    

 